This week’s construction update

The Hawaiian Dredging and CMC crews are continuing with the installation of reinforcing steel and post tensioning cables for the second section of the parking structures second-floor concrete deck. Work on the second-floor concrete columns and walls also commenced this week. The MIRA crews continued with the installation of the sewer system improvements on Vineyard Street between Church and High Street this past week.

Read More
This week’s construction update

The Hawaiian Dredging crews poured the first section of the parking structures second-floor concrete deck this past week. The Hawaiian Dredging and CMC crews are continuing with the installation of reinforcing steel and post tensioning cables for next section of the parking structures second-floor concrete deck. The concrete foundation for the parking structure entrance at Church Street was also poured this week. The MIRA crews continued with the installation of the sewer and water system improvements on Vineyard Street between Church and High Street this past week.

Read More
This week’s construction update

The Hawaiian Dredging crews are continuing to pour additional sections of the ground floor concrete pavement. The HDCC and CMC crews also completed the installation of reinforcing steel and post tensioning cables for a portion of the second-floor concrete deck this past week. The MIRA crews commenced with the installation of the new sewer system on Vineyard Street between Church and High Street this past week. The Hawaiian Telcom crews also continued to install their underground wires for Church and Lower Vineyard Street. Hawaiian Electric crews also converted electrical service from overhead to underground for two buildings Vineyard Street this past week.

Read More
This week’s construction update

The Maui Kupono crews are continuing with the excavation work for the parking structure foundations along Church Street. The Hawaiian Dredging crews are continuing to pour additional sections of the ground floor concrete pavement and install formwork for the second floor concrete beams and decks. The MIRA crews began preparatory work to replace the existing sewer system on Vineyard Street improvements between Church and High Street this past week. The Hawaiian Telcom crews also continued to install their underground wires for Church and Vineyard Street.

Read More
This week’s construction update

The Hawaiian Dredging crews commenced with excavation work for the parking structure foundations along Church Street. The Hawaiian Dredging crews are also continuing to work on the formwork for the second floor concrete beams and decks. The MIRA crews are continuing work on the Vineyard Street improvements between Church and High Street this past week. The Hawaiian Telcom crews also began installing their underground wires for Church and Lower Vineyard Street.

Read More