This week’s construction update

Wailuku Parking Structure:
The Hawaiian Dredging and CMC crews are continuing with the installation of reinforcing steel and post tensioning cables for the second section of the parking structures second-floor concrete deck. Work on the second-floor concrete columns and walls also commenced this week.   

HDCC crews installing concrete wall forms

Installing concrete wall forms

CMC crews installing reinforced steel for the second floor columns and walls

Installing reinforced steel for the second floor columns and walls

CMC crews installing the second floor deck reinforcing steel

HDCC crews pouring second floor concrete column

Vineyard Street Improvements:
The MIRA crews continued with the installation of the sewer system improvements on Vineyard Street between Church and High Street this past week.

MIRA crews installing new sewer system manhole on Vineyard Street

MIRA crews excavating for the new sewerline on Vineyard Street

MIRA crews excavating for the new sewerline on Vineyard Street

New sewerline on Vineyard Street

General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Vineyard Street between Church and High Street will be closed to thru traffic Monday to Friday between the hours of 8:30 am to 3:30 pm. 

The Wailuku Parking lot is completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway, Wells Park and War Memorial Stadium Parking Lot) and various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, click here.