This week’s construction update

Wailuku Parking Structure:
The Hawaiian Dredging crews are continuing to work on the installation of the concrete beam and deck forms for the second floor of the parking structure.  

General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Please also drive with caution on Vineyard Street as lane closures will be occurring during the day.

The Wailuku Parking lot is now completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway, Wells Park and War Memorial Stadium Parking Lot) and various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, click here.

HDCC crews installing second floor concrete beam forms

Second floor concrete beam forms

HDCC crews forming sidewalks at the First Hawaiian Bank Parking lot

Installed second floor concrete deck forms