This week’s construction update
Wailuku Parking Structure:
The Hawaiian Dredging crews continued with work on the concrete columns and walls for the parking structure. Additional sections of the ground floor concrete pavement were also poured this week. The Hawaiian Dredging crews also began preparing forms for the second floor concrete beams.
Main and Church Street Intersection Paving:
The MIRA crews will be paving the Main and Church Street intersection next week Tuesday and Wednesday nights. Main Street between High and Market Street will be closed from 9:00 pm to 5:00 am on both nights.
General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Please also drive with caution on Vineyard Street as lane closures will be occurring during the day.
The Wailuku Parking lot is now completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway, Wells Park and War Memorial Stadium Parking Lot) and various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, please click here.
HDCC crews pouring a section of the ground floor concrete pavement
Finished concrete pavement
Maui Kupono crews preparing subgrade for the ground floor concrete pavement
HDCC crews preparing to install forms for the second floor concrete beams