This week’s construction update
Wailuku Parking Structure:
The Hawaiian Dredging crews continued with the installation of concrete beam and deck forms for the third floor this past week. The HDCC and CMC crews also continued work on the second-floor concrete columns and walls.
HDCC crews installing concrete column and wall form
HDCC crews removing the second-floor concrete beam forms
HDCC crews pouring second-floor concrete walls and columns
CMC crews installing reinforcing steel for the third-floor concrete beams
CMC crews installing reinforcing steel for the third-floor concrete beams
HDCC crews removing concrete walls forms
Vineyard Street Improvements:
The MIRA crews continued with the installation of new sewer laterals to each of the properties along Vineyard Street.
MIRA crews backfilling sewer mainline trench
MIRA crews excavating trenches for new sewer laterals
Crews excavating trenches for new sewer laterals
MIRA crews backfilling sewer lateral trench
MIRA crews backfilling sewer lateral trench
General Notices:
Due to the ongoing work on Vineyard Street, motorists and pedestrians should be cautious when traversing through the area. Vineyard Street between Church and High Street will be closed to thru traffic Monday to Friday between the hours of 8:30 am to 3:30 pm.
The Wailuku Parking lot is completely closed. Parking is available in various locations, as well as free shuttle service on Da Bee (includes parking at Maui Lani Safeway, Wells Park and War Memorial Stadium Parking Lot) and various “flower” stops in Wailuku. For information on shuttle schedules/routes and a list of parking locations in Wailuku, click here.